Local Leaders Tour Site of Proposed Chehalis River Dam

Mitigation: Flood Control District Leaders Hear Cost Estimates, Discuss Three Potential Types of Structures

 Project designer Keith Moen of HDR Engineering, left, walks across a bridge where the proposed dam would be located. The area in the background is the upstream side of the proposed dam.  Graham Perednia / gperednia@chronline.com

Project designer Keith Moen of HDR Engineering, left, walks across a bridge where the proposed dam would be located. The area in the background is the upstream side of the proposed dam.

Graham Perednia / gperednia@chronline.com